The newly built 500kV power grids (marked as red lines) from CCS hydro power plant to Guayaquil load center includes four major 500kV/230kV substations, which had connected the new 500kV corridor to the existing national 230kV power grids, feeding the existing grids with sufficient power supply. This big project had greatly enhanced the power transmission capability of CELEC EP. However a system study before the project shows that the loads variations as well as possible line faults may badly influence the grid stability especially at the load center at Guayaquil.
RSVG for load compensation of electric arc furnace--Substation of Fujian Hua'an hydropower plant. The 10kV busbar of Fujian Hua'an hydropower plant power development company 35kV Jinshan No.2 substation is connected with four feeders of Yuxing I, II, III and IV for the load of HUAYIXIN iron plant. Yuxing I and II feed two 8000kVA electric arc furnaces respectively, YuxingIII supply one 4000kVA refining furnace, Yuxing IV supply one 630kVA power transformer and 5000kVA reactive power compensation device. In normal production, two EAF and refining furnace will be produced at the same time.
With the rapid development of electrified railway, its influence on power supply and consumption system side is increasingly prominent. Because the railway is a 27.5kV single-phase load, if the balance compensation is not carried out, the voltage of the public access point will be seriously unbalanced, which will have a serious impact on other loads of the network point.